Forged Carbon Steel Stainless Steel Pipe Flanges Welding Neck Carbon Steel Anchor Flanges
Basic Info
Model NO. | Flange 09 |
Structure | Flanges |
Connection | Welding |
Sealing Surface | RF,FF,Wn,So,Blind, etc |
Manufacturing Way | Forging |
Product Name | Steel Flange |
Class | Class150-Class2500 |
Flange Face Type | ASME B16.48-2010,API 590-1993 |
Transport Package | Wooden Pallet, Wooden Case, etc |
Specification | 1/2′-48" |
Trademark | Hebei Cangrun Pipeline Equipment |
Origin | China |
HS Code | 7307910000 |
Production Capacity | 5000 Tons/ Year |
Packaging & Delivery
Package size per unit product 100.00cm * 100.00cm * 100.00cm Gross weight per unit product 500.000kgProduct Description
Forged Carbon Steel Stainless Steel Pipe Flanges Welding Neck Carbon Steel Anchor Flanges
1.Material:Carbon steel A105/Rst37.2/C22.8/Q235 Stainless steel 304/304L,316/316L,321,ect.
2.Size:1/2"-48"
3.Pressure:150lbs-2500lbs PN0.6-PN16.0
4.Facing:RF/RJ/ FF
5.Standard:ANSI(ASME)16.5 16.47/DIN/JIS/UNI/...
6.Flanges of welding neck, socket welding, threaded, blind, slip on, lap joint are in accordance with ANSI 16.5 from 1/2" to 24" and classes 150 to 2500 (complete range).
7. Production process : raw material--cutting--heating--forging--heat treatment--maching--inspection.-washing-ex-working.
8. Certificate :ISO9001-2008
9. Used for : linepipe, heat exchanger, petroleum,chemical,power,gas,water,shipbuilding,construction,etc.
10.Blind, slip on, welding neck flanges are from 6 Bar to 40 Bar in accordance with DIN.
11.Flanges from 1/2" to 48" and up to 450 lbs are in accordance with BS10 Table D & Table E, BS Table F & Table H, BS Table J & Table K.
12.Flanges from 2kg to 210 kg are in accordance with JIS.
13.Flanges according to API 605/ASME B16.5/ASME B16.47
14.Depending on special purposes, flanges can be manufactured in different shapes and sizes
15. Excellent and high quality control.
Contact: Sunny SunHebei Cangrun Pipeline Equipment.Office address: Haowei Building, Lianmeng Road, Xinhua District, Shijiazhuang City,Hebei Province,ChinaFactory address: Bobei Industrial Zone, Cangzhou City,Hebei Province, China Detailed PhotosDescriptions | Size | Remarks | Pictures | |||||
Elbow | 45°/60°/90°/180° | 1/2"-48" | Standard: ANSI; BS; JIS; DIN; MSS; etc | |||||
Flanges | PL/SO/WN/SW/BL/IF | 1/2"-48" | Material: Carbon steel; Stainless steel; Alloy steel; Cast iron; etc | |||||
Reducer | CON/ECC | 1/2"-48" | Structure Technique: Forged and casting flanges. | |||||
Tees | Equal/reducer | 1/2"-48" | Surface Coating technique: Sand Blast; Lacquering; | |||||
Nipple | Threaded/Hex/ Round | 1/2"-48" | Surface finishing: black, electro-galvanized, hot-galvanized | |||||
Union | Male/female | 1/8"-6" | Pressure:3000#-9000# | |||||
Outlet | Weldolet/threadolet/socko let | 1/8"-6" | Standard:MSS SP-97 | |||||
Cap | BW CAP | 1/2"-48" | Best price&high quality | |||||
Coupling | SW/Threaded | 1/8"-6" | PLE;PSE;TLE,BSE;TOE | |||||
Plug | Square/hex/round | 1/8"-4" | Large QTY&Lower price | |||||
Bushing | Round/Hex/Flush | 1/8"-4" | Pressure:3000#-9000# | |||||
Swaged nipple | Threaded/Plain | 1/8"-4" | SCH10S-SCH80 |
Production Equipment
Company Profile
Hebei Cangrun Pipeline Equipment. specialized in pipe fittings ,flanges and nipples. Our company has strong technical force. With complete
production equipment, it has more than 120 sets of production equipment, including 8000 tons of four column press, 1600 tons of pushing machine,
800 tons of large pipe bending machine and 8 tons of forging hammer. It can produce valves, flanges, elbows, elbows, tees, crosses, reducers, pipe
caps, sockets and other pipe fittings and extension products of all specifications of carbon steel, alloy steel, stainless steel, pipeline steel, low-
temperature steel and other materials according to domestic and international and industrial standards, We adhere to quality first, customer first, is
our purpose. Certifications
FAQ1. What about your MOQ ?
MOQ is one piece, we can offer sample for free, customer just pay the transport charge.
2.What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times
become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with
your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do
so.
3.What about payment term ?
You can make the payment to our bank account, Western Union or PayPal:
30% deposit in advance, 70% balance against the copy of B/L.
4. What about package ?
As usual with wooden pallet, wooden case, we can also pack the products as customers' requirement.